Dynamics 365 Project Operations: Optimize Project Operations - Configure maximum daily time entry duration
Microsoft lists this Dynamics 365 Project Operations roadmap item as Launched, with general availability in August 2026.
Launched1 version
Facts
- Microsoft id
576859- Status
- Launched
- Products
- Dynamics 365 Project Operations
- General availability
- August 2026
- Release rings
- General Availability
- Platforms
- Web
- Cloud instances
- Worldwide (Standard Multi-Tenant)
- More information
- learn.microsoft.com
- First captured by us
- (from our first import of this list)
- Microsoft last modified
- Source
- Microsoft 365 roadmap · open the original at Microsoft
Microsoft says
Project Operations sets a 24-hour limit on daily time entry hours that can be logged (including vacation hours).
What Microsoft changed
One version so far. If Microsoft edits it, each change shows here with what was removed and added.
First version we captured ·
As first seen: Launched
- Status
- Launched
Seen by us · Microsoft's timestamp · Microsoft's page
Last updated